Winter construction measures of concrete mixing station
Winter construction measures of concrete mixing station
1 Temperature Monitoring
After entering November, the temperature should be carried out daily daily maximum and minimum temperature determination, and timely feedback to the relevant departments. To listen to the weather forecast, pay attention to sudden cold.
2 boiler and heating pipeline maintenance
Must be before 5 November for boiler and heating pipeline maintenance and debugging operation, ensure the use of raw materials of concrete in winter heating heating and heating living area.
3 material inspection
According to the requirements of concrete construction technology in winter, preferably in advance concrete antifreeze (chlorine ion content, and meet the requirements) in winter before antifreeze material inspection and mix design test. And than the water cement ratio not greater than 0.6 with the temperature -5, according to -10 -15, three degrees C temperature of different design. See the specific mix report.
4 winter construction plan preparation materials
According to the needs of winter construction, various departments of winter construction materials, purchase and reserve work plan. And in the winter before the arrival of good.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China