requirements of concrete batch plant before work
requirements of concrete batch plant before work
(1) the mixing barrel and the supporting facilities and transmission parts warehouse door, Doumen track no foreign body stuck;
(2) the tank oil level in accordance with the rules;
(3) opens valve discharge gas path system of gas and water separator too much water, open storage cylinder drain plug release of oil-water mixture;
(4) to enhance the bucket or pull shovel of wire rope, drum around are accurate, wire rope and pulley fit rules, improve the hopper and pull shovel brake active useful;
(5) all bolts are tight the inlet or discharge valve without limit wear, each conveyor belt tension is appropriate, without deviation;
(6) weighing equipment all control and show some normal work, the accuracy of fit rules;
(7) the electrical equipment can be useful to control the mechanical action of the contact points and the dynamic and static contacts without significant damage.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China