Faults of Gas System in Concrete Mixing Plant(2)
Fault of Gas System in Concrete Mixing Plant - Cylinder Fault
(1) Cylinder, external leakage, usually due to eccentric piston rod installation, lack of oil supply, seals and seal rings wear or damage, there are impurities in the cylinder and the piston rod caused by scars and so on. Should be re-adjusted the central position of the piston rod, the need to regularly check the reliability of the oil mist, the timely removal of impurities in the cylinder; piston rod scars, the new pieces should be.
(2) cylinder output force is not enough and the action is not smooth, usually due to the piston or piston rod is stuck, poor lubrication, lack of air supply, or cylinder with condensed water and impurities. The center of the piston rod should be adjusted; check the reliability of the work of the oil mist; air supply pipe is blocked, the cylinder should be promptly removed condensate and impurities.
(3) cylinder cushioning effect is poor, generally due to buffer ring wear or damage to the adjustment screw, should replace the sealing ring and adjusting screw.
(4) piston rod and cylinder head is damaged, usually due to eccentric piston rod or buffer mechanism does not work, should be promptly adjust the piston rod center position, if necessary, replace the buffer seal ring or adjustment screw.
website: www.haomeimachinery.com to see more information about different parts of concrete batching plant, and if you have more question about it, feel free to contact us, we will reply you as soon as possible.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China