The operation considerations of concrete batching station
The concrete batching station has a complicated system, and each component system has its own functions. The function of the whole set of concrete batching plant is match and mix the sand, aggregate, cement powder, water and external additives according to a certain ratio, and finally the finished concrete is produced. It can be said that all links can not go wrong with problems. Today we will talk about the problems that should be paid attention to during the batching process in the concrete mixing station. If you encounter such similar problems, you should pay more attention to it and prevent it in time.
At present, the concrete mixing station generally adopts a fully automatic control system, and the mixing ratio of various materials is set in advance, and the automatic measurement is performed with small error. But after all, it also requires timely observation and comparison of operators. When the concrete mixing station is put into production, it is necessary to pay attention to the measurement error, the adjustment of the overshoot and the residual amount of the feeding process to ensure that the accuracy of the measurement meets the requirements. When the concrete produced in the concrete batching plant is mixed with admixture, the mixing time should be extended appropriately. When admixture is added in dry way, the concrete mixing time of fly ash is 10-30 seconds longer than ordinary concrete, and the concrete of other admixtures is extended by 30-60 seconds. In addition, the concrete mixing station operator must be clear about the function of the various control components of the batching plant, and be proficient in the correct operating sequence and operating procedures. Only in this way, can the concrete batching station be handled correctly in the event of an emergency, to avoid operational errors, equipment damage and material loss.
At present, the concrete mixing station generally adopts a fully automatic control system, and the mixing ratio of various materials is set in advance, and the automatic measurement is performed with small error. But after all, it also requires timely observation and comparison of operators. When the concrete mixing station is put into production, it is necessary to pay attention to the measurement error, the adjustment of the overshoot and the residual amount of the feeding process to ensure that the accuracy of the measurement meets the requirements. When the concrete produced in the concrete batching plant is mixed with admixture, the mixing time should be extended appropriately. When admixture is added in dry way, the concrete mixing time of fly ash is 10-30 seconds longer than ordinary concrete, and the concrete of other admixtures is extended by 30-60 seconds. In addition, the concrete mixing station operator must be clear about the function of the various control components of the batching plant, and be proficient in the correct operating sequence and operating procedures. Only in this way, can the concrete batching station be handled correctly in the event of an emergency, to avoid operational errors, equipment damage and material loss.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China