concrete batch plant planning criteria
concrete batch plant planning criteria
1, mixing station planning should save land, saving investment, environmental protection and energy saving, permanent and temporary connection, reasonable and useful criteria, should pay attention to disaster prevention and mitigation, protection of cultural relics and other operations.
2, mixing station construction planning should consider the production status, dividing the work area, the measurement data area, data accumulation area and mixing transporting vehicle parking areas. When the equipment and work with the production area of equipment shall depart, try to use the neighbouring towns and houses and equipment.
3, mixing station location and planning time requirements for transporting and mixing engineering conditions, concrete construction tasks and the maximum peak intensity, (supply radius of not more than 15km), the technical and economic comparison concluded.
4, mixing should be based on the construction organization planning on station planning, put forward planning scheme according to the terrain conditions. Land should be based on the maximum monthly construction task amount, and other factors to determine the accumulation of. Planning should be based on the maximum monthly production capacity of concrete construction tasks and the peak intensity of that and think about spare.
5, concrete batching plant for land use should be "tailored, criterion of reclamation summed up".
6, in addition to the mixing station set should fit methods, there should be compliance with the current national mandatory standards.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China