Mixing station monthly check and maintenance project
1, see the belt is not wear, belt wear to a certain extent, should be replaced.
2. Check and adjust the brake device of the inclined belt conveyor, and then replace the brake pad to a certain degree.
3, regular cleaning of the reduction gear and view of the reducer in the bearings and gears are not worn, such as excessive wear (more than tooth top width), should be promptly repaired.
4, see the electric roller and the reducer is not leakage, oil is not prepared. If so, repair or replace the smooth oil in time.
5, regular filling in the body smooth grease.
6, see the blade, the lining of the wear condition and the connection bolt is loose, if the wear is more serious no adjustment should replace the blade or lining board.
7, view all the exercise status, to see whether there is any loosening of the connecting piece.
8, to see whether the weight of the organization of the soft connection is loose.
9, the entire view of the gas and its joints have no leakage.
10, regular cleaning roller bearings.
11, according to the motor maintenance needs repair motor.
12, time to open all parts for repair or replacement. Installed under the shaft ends of the parts should be cleaned, especially the contact surface between the components must be kept clean, the lubrication should be filled with butter.
13, check the bag dust removal equipment mixing silo in the main building and the blocking condition, cleaning or replacing the filter bag.
14, lock the bolts, screws and nuts on the parts.
website: www.haomeimachinery.com to see more information about different parts of concrete batching plant, and if you have more question about it, feel free to contact us, we will reply you as soon as possible.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China