Mixing station electricity using safety
Mixing station electricity using safety
1, mixing station all staff to participate in the live working, must be qualified after professional training and examinations, homework before safety technical disclosure, quasi engaged in operation;
2, regular on electric operator of a safety test technology, for some reason interrupted electrical work continuously for more than three months' must be to learn about electrical operation rules, and after passing the examination subjects, to restore its electrical work;
3, the construction site of the power distribution lines must be installed safety devices, leakage protection devices or electrical safety interlocking devices, signal devices;
4, distribution lines on the starting end of each branch must be equipped with a circuit breaker and an effective short-circuit and overload protection;
5, the distribution transformer must be equipped with a fence, and keep clean and tidy, not planted in any position;
6, must be in accordance with the procedures of stop, point to send, it is strictly prohibited to load or load of fault zone, to stop and sent to a high-voltage line, thunderstorm weather not of switching operation and replacement of fuse fuse work.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China