Concrete mixing station inclined belt problems
Concrete mixing station inclined belt problems
Concrete mixing station drum mixer batching silo cement silo
Cause of failure:
A. inclined belt maintenance / emergency stop switch is not reset, processing: check reset.
B. inclined belt conveyor power switch is connected to deal with: switch on the power distribution cabinet air switch.
C. did not press the inclined belt machine to start the order, processing: first start the higher belt and then start the lower belt.