Concrete mixing plant check and maintenance projects weekly
Concrete mixing plant check and maintenance projects weekly
(1) to check the mixing situation of concrete, to see if there are any condensation should stop, the detection power, personal care, manual eradication. View the mixing blade with plate gap. so if it isn't, we need to adjust.
(2),to check the gas circuit system of leak is representation or each cylinder is stable.
(3) to check if the electrical system of the electrical components are damaged, it there is, we need to repair damage of replacement. and then check all wiring is loose or not.
(4) check reducer smooth oil quality and level. if it is not demand, we should be to replace or add.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China