Concrete Mixing Plant Planning Criteria
Concrete Mixing Plant Planning Criteria
1, concrete mixing plant planning should be performed to save land, saving investment, environmental protection, energy conservation, the permanent contact, reasonable and useful guidelines should pay attention to disaster prevention and mitigation, heritage conservation and other operations.
2, concrete batching plant planning should be summarized thinking about the construction production status, a reasonable division of the mixing zone, data measurement area, data accumulation area and transport vehicle parking area, etc.. Day equipment and work equipment should be separated from the production area, as far as possible to use the neighboring villages and towns house and equipment.
3, stirring station location and planning should be according to transport and engineering conditions, concrete construction tasks and peak intensity, the mixture usage time (supply radius of not greater than 15 km), the technical and economic comparison concluded.
4, mixing station planning should be based on the construction organization planning and overall thinking, based on the terrain conditions put forward planning and planning. Land use should be based on the construction of the largest amount of tasks, and other factors to determine the accumulation of factors. Planning and production in order to be based on the construction of the largest concrete tasks to determine the maximum intensity and the peak intensity, and think about the backup.
5, mixing station for land use should be "tailored, criterion of reclamation summed up".
6, mixing station should be set up in addition to the method, it should be fit with the state of the existing rules of the mandatory standards.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China