six precautions for concrete batching plant
six precautions for concrete batching plant
1.first, the ready mixed concrete batching plant need to be operated by professional operators.
2.before we adjust the commercial concrete batching plant, we need to check the voltage of each powder and capacity to meet the requirements. and we also need to see if there is leakage or short circuit, if it has, we need to fix it in time.
3.adjusting the concrete batching plant is equivalent to maintain working, and the stafff must clean up the parts of concrete batching plant.
4.if the concrete mixing plant adopts belt conveyor, when we adjust the belt, we must be far alway from the machine to keep safe.
5.the power must be de-energized if we want to adjust the devices
6.when we working in adjustment of gas line, we must make the gas get out of it, except for blackout.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China