Tel: +86-371-65621392 | Mail: chris@concretebatchplant24.com‍

Correct use of Self Loading Mixer Beton Mini

The correct use of the self loading mixer beton mini is conducive to the smooth progress of the construction and can improve the efficiency of the engineering work. If it is not used correctly, it will damage the mechanical parts of the equipment and reduce its service life. The most important thing in use is to strictly follow the instructions for use. Generally, if the temperature of the self loading concrete mixer is too high in summer, it should be stopped immediately, and then continue to use after the temperature drops.

self loading mixer beton mini
 
1, When operating the self loading mixer beton mini, note that the pressure of the hydraulic system should comply with the regulations in the instruction manual, and should not be adjusted at will. The quality and quantity of hydraulic oil should meet the original requirements.
2, When operating the self loading beton mixer, pay attention to the water and sundries remaining in the mixing drum before loading. Rotate continuously during transportation to prevent segregation of concrete. Before the concrete mixer arrives at the construction site and unloads, the mixer should be rotated at full speed at 14-18 rpm for 1-2 minutes, and then reverse unloading. Before reversing, the mixing drum should be stopped, and then the reversal should be turned on. 
3, When the ambient temperature of self loading concrete mixer is higher than +25 degrees Celsius, the duration from loading, transportation, and unloading shall not exceed 60 minutes, and when the ambient temperature is lower than +25 degrees Celsius, the above-mentioned time shall not exceed 90 minutes. 
4, During winter construction, it should be done: check for icing before starting; carefully remove the residual water in the mixing drum and the water supply system when off work, turn off the water pump switch, and place the control handle in the stop position. 
5, After unloading at the construction site, immediately use the hose that comes with the equipment to flush the feed hopper, discharge hopper, unloading chute, etc., to remove the sludge and concrete adhering to the body. 
6., At the end of the work day, the driver should be responsible for injecting clean water into the mixing drum of the self loading mixer beton mini and rotating it at high speed (14-18 rpm) for 5-10 minutes, and then drain the water to ensure that the drum is clean. When cleaning various parts of the mixing drum with high-pressure water, pay attention to avoiding parts such as meters and joysticks. The distance between the pressure water nozzle and the paint surface of the body shall not be less than 40 cm.

Inquiry

(Please write down the product model or any requirement)
E-mail:
Message:
 

Contact Information

E-mail:chris@concretebatchplant24.com‍
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China

Sitemap
Home
Products
Cases
About Haomei
Service
Contacts
All Products
Mobile Concrete Plant
Conrete Batching Plant
Concrete Pump
Concrete Mixer Truck
Concrete Mixer
Concrete Batching Plants
Hot Sale
Yhzs60 mobile batching plant
Yhzs75 mobile batching plant
hzs75 concrete batching plant
hzs180 concrete batching plant
HM6-D Concrete Mixer Truck
Other link
Facebook
Youtube
Linkedin

Copyright © 2013 - All Rights Reserved - HaomeiMachinery.com