self loading concrete plant maintenance
self loading concrete plant maintenance
when we use ready mixed concrete batching plant, we need to make some measures to maintain to have a better long life.
(1), promptly discharge condensate tank after shutdown following open drain valve, tipped condensate.
(2), regularly changing the oil, generally determined by the operation time of the air compressor, every 1,000 hours or four months to replace with new oil.
(3), regular cleaning air filter, because the filter is too dirty, too much lead dust into the air compressor cylinder, acceleration cylinder and piston ring wear, and easy to form coke affect the valve tightness; serious also cause pull-cylinder, blow-by gas, lubricating oil pollution, the impact of lubrication; blow when the phenomenon will produce oil, cylinder walls and piston ring gap is too large, the contaminated oil will fleeing compression chamber and formation of oil mist, contaminating the air. (Paper filter cleaning, blowing with compressed air from the inside out; if it is filled sponge filter, wash with a detergent to dry)
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China