The ready mix concrete plant is essential equipment in ready mix concrete company, so far, the mixing capacity of a china ready mixed concrete mixing plant can be up to 240 m3/h. Due to the high mixing task, the right operation is very significant. Are there any professional advice from china ready mixed concrete mixing plant company? What are the damages to the concrete mixing plant equipment caused by illegal operation?
china ready mixed concrete mixing plant company
1)To concrete mixer
Incorrect operation is easy to cause the malfunction of the concrete mixer. For the mixing of materials with different properties, different weights and different mixing ratios, the concrete mixer has obvious differences in some important parameter settings such as stirring time and stirring speed. If the operator change the parameters of the concrete mixer, if the agitation speed is too fast, or the agitation time is too long, the agitator shaft will be damaged. Therefore, Haomei ready mixed concrete mixing plant company suggest that the operation of the concrete mixer must be operated by the professional and technical personnel.
2)To weighing system
Incorrect operation is easy to destroy the weighing system of the ready mix concrete plant. Taking the commercial concrete mixing plant as an example, the weighing accuracy of materials and moisture is very high. The operation of non-professionals will cause the weight of the material and moisture are not in accordance with the requirements, and the weighing system damage will be caused by excessive material, and material leakage will damage the sensor, which in turn affects the mix ratio of the entire commercial concrete, which ultimately leads to the failure of the subsequent production of concrete products. Therefore, Haomei Machinery recommends that the operation of the concrete mixing plant weighing system must employ professional laboratory personnel to operate, and do not arbitrarily change or adjust the set data.
3)To cement silos
Incorrect operation is easy to destroy the stability of the material stored in the cement silo. However, in the process of storage cement, it is necessary to pay attention to the speed of charging and discharging, and whether the inlet and outlet are blocked, the cleaning operation at the top of the cement silo, etc., all of which require professional staff to complete the operation. If it is operated by non-professionals, it is easy to appear in the outlet blockage and the top of the cement silo affect the stability of the storage materials in the cement silo due to too much damage to the concrete ash.

The correct operation is very important. We china ready mixed concrete mixing plant company suggest that, for the operators, training should be intensified to avoid unnecessary losses caused by improper operation.

Inquiry

(Please write down the product model or any requirement)
E-mail:
Message:
 

Contact Information

E-mail:chris@concretebatchplant24.com‍
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China

Sitemap
Home
Products
Cases
About Haomei
Service
Contacts
All Products
Mobile Concrete Plant
Conrete Batching Plant
Concrete Pump
Concrete Mixer Truck
Concrete Mixer
Concrete Batching Plants
Hot Sale
Yhzs60 mobile batching plant
Yhzs75 mobile batching plant
hzs75 concrete batching plant
hzs180 concrete batching plant
HM6-D Concrete Mixer Truck
Other link
Facebook
Youtube
Linkedin

Copyright © 2013 - All Rights Reserved - HaomeiMachinery.com