Working procedure of concrete mixing station

Working procedure of commercial concrete batching plant

Here haomei will share some information of ready mixed concrete batching plant working procedures with you as followings: Raw materials are transported into the car plant, fly ash (or sand, stone powder) in the raw materials field, when used with the shipment into the hopper. Bagged cement or cement in bulk cement stored in the library. When used with the shipment into the hopper. Chemicals, aluminum and other chemicals were placed in the library, the library aluminum shipment to the use of each workshop. 

Process: aerated concrete block material handling fly ash (or sand, stone powder) by electromagnetic vibrating feeder, belt conveyor into the ball, fly ash (or sand, stone powder) ground after fly ash slurry concrete pump were sent to the storage tank. Lime by the electromagnetic vibrating feeder, belt conveyor into the jaw crusher for crushing, crushed lime by bucket elevator into the lime silo, and then by a screw conveyor into the mill, grinding after materials are screw conveyor, bucket.

Inquiry

(Please write down the product model or any requirement)
E-mail:
Message:
 

Contact Information

E-mail:chris@concretebatchplant24.com‍
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China

Sitemap
Home
Products
Cases
About Haomei
Service
Contacts
All Products
Mobile Concrete Plant
Conrete Batching Plant
Concrete Pump
Concrete Mixer Truck
Concrete Mixer
Concrete Batching Plants
Hot Sale
Yhzs60 mobile batching plant
Yhzs75 mobile batching plant
hzs75 concrete batching plant
hzs180 concrete batching plant
HM6-D Concrete Mixer Truck
Other link
Facebook
Youtube
Linkedin

Copyright © 2013 - All Rights Reserved - HaomeiMachinery.com