What should we do before start concrete mixing plant
What should we do before start concrete mixing plant?
1.while we need to make sure that the machine have sufficient fuel for the whole ready mixed concrete batching plant, and if it is not, add it in time to make sure the usual working procedure.
2.oil-way of the concrete mixing plant. For this part, we need to check if there is leakage on it. Besides, we also need to know that the oil-way can be discharged perfectly.
3.check parts of mobile concrete batching plant. To make sure every part be firm and realible, and the moving parts should be flexible without resistance.
4.Cooling water. Add soft water and make sure there is no leakage on it and add it in time.
5.Manual lubrication and debris of concrete mixing plant. We should add enough lubricating oil to the manual oiling position. Check the surrounding and top of concrete mixing plant. If there is a tool or other debris, we should keep it well.
6.For manual rotation. The crankshafts will be stirred by human, and we also need to turn many turn before starting. In this case, the lubrication condition of all friction parts can be improved, and the starting resistance also can be reduced. When we turn the crankshaft, the oil quantity control mechanism should be in stopping oil supply position, if there is a pressure decreasing mechanism, it should be placed in the decompression lun.
Haomei company has been in this field for many years, and we will more information about all kinds of things to share with you, please following our website.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China