Rescue measures of lifting equipment
Rescue measures of lifting equipment
Lifting machine has played an important role in the ready mixed concrete batching plant , and here haomei will share some notices of lifting machine with you.
(1) When the job was found when ground subsidence phenomenon inclined lifting equipment should be immediately loose hook, put down lifting objects, can be used to increase the contact surface with the ground skids increase, thereby increasing the ground support force, and so on pad level equipment before making operations.
(2) the lifting operation shall be equipped with a full-time command staff, below the operating range may not have personnel through or stay, such as overturning available after mechanical jacks, hoists, and other lifting equipment for rescue, machinery and equipment to be placed smoothly, then the line repair, be put into use after passing the examination.
(3) When the lifting device discovery tilt, should immediately stop operation, when the lifting operation of mobile concrete batching plant is slow down when lifting objects, and then wind cable rope secured to prevent the spread of the accident, and then jacking up the track and pad level, confirm the safety and reliability after the construction.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China