Operation rules of concrete batching plant

Operation rules of concrete batching plant

1.the training for staffs who will be in charge of operating ready mixed concrete batching plant. well, when operators are in situationof being sick or drinking, they are not allowed to operate machines, and even if they are not allowed to smoke in the operating room.

2.If the power outage caused downtime, operators should immediately open the discharge door, and then put as much as stirring mixture in cylinder, in order to prevent condensation;

3.Every department should operate the machines according to the instruction, to avoid damaging the equipments. Besides, It is strictly prohibited to change the way of working in the process of system operation.

4.three inspections for the whole concrete ready mix plant, while the operators need to check and fasten the fasteners, like, they need to check if there is fix for the parts. In addition, operators should also inspect the reliability of each main switch, button, and indicator, limit device, and make the record of the operation well.

5.before we start working the whole mobile or  mobile concrete batching plant, the operators need to check whether the gas path and the water supply system is working properly, and check whether the feeding of aggregate bin and cement silo is full. The stored water in the water supply system should be released after the operation in winter

6.If there are some unexpected situations in the process of equipment operation, operators should immediately press the emergency stop button, switch off the system control power down to check, the engine can be restarted after troubleshooting;
 

7.After the operation, the mixing plant should be comprehensive cleaned and swept after the control power off; Operators should strictly implement the management plan and measures for dust, noise, waste water and waste emissions control, and do a good job of environmental protection.

8.When the mixing plant need to be repaired, the total power must be disconnected, and the special person to guard;When the mixing main engine is working, half-way down is avoided strictly;

Haomei company has been in this field for almost 15years, and we are mainly focus on concrete batching plant and concrete mixer truck and pump. Here is our website: www.haomeimachinery.com. while if you need any products, feel free to contact us.

More information on this site will be offered, so please continue to follow.


 

Inquiry

(Please write down the product model or any requirement)
E-mail:
Message:
 

Contact Information

E-mail:chris@concretebatchplant24.com‍
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China

Sitemap
Home
Products
Cases
About Haomei
Service
Contacts
All Products
Mobile Concrete Plant
Conrete Batching Plant
Concrete Pump
Concrete Mixer Truck
Concrete Mixer
Concrete Batching Plants
Hot Sale
Yhzs60 mobile batching plant
Yhzs75 mobile batching plant
hzs75 concrete batching plant
hzs180 concrete batching plant
HM6-D Concrete Mixer Truck
Other link
Facebook
Youtube
Linkedin

Copyright © 2013 - All Rights Reserved - HaomeiMachinery.com