How to maintain the concrete batching plant
Each time you use the machinery, we need to keep the body clean, clean dirt and stagnation on the matter of the body. Accompanied by staff to check and control the oil and circuit configuration for lubrication and add oil as required. Operator before class thing, we need to add water while stirring cylinder idling 1-- to two minutes, check the clutch and brake at the same time something reliability.
This is a concrete mixer running processes precautions should always check to listen to the motor, reducer, transmission gear noise is normal, the temperature rise is too high,
Finally, to remind everyone that after the end of each class of things, it should be careful to wash static concrete mixer station. So really concrete mixer complete daily maintenance work.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China