Tel: +86-371-65621392 | Mail: chris@concretebatchplant24.com‍

Concrete mixing station checking before working

Concrete mixing station checking before working

1) Running for the inside cylinder of concrete mixer, moving parts and doors and trails are not blocked.

2) Each tank oil surface height is suitable for the standard.

3) Open the valve discharges of the gas system in excess water gas-water separator, sewage drain plug open air reservoir release water mixture;

4) enhance the dragline bucket or rope installation are correct winding reel, wire rope and pulley compliance, improve dragline bucket and brake sensitive and effective;

5) Ministries bolts are tightened, each inlet and discharge valves wear no overrun, each belt tension properly, without deviation;

All control and display some of the work.

6) Normal weighing device, the accuracy of compliance;

7) All electrical devices can effectively control the mechanical movement, the contact point and the dynamic and static contact no obvious damage.

Inquiry

(Please write down the product model or any requirement)
E-mail:
Message:
 

Contact Information

E-mail:chris@concretebatchplant24.com‍
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China

Sitemap
Home
Products
Cases
About Haomei
Service
Contacts
All Products
Mobile Concrete Plant
Conrete Batching Plant
Concrete Pump
Concrete Mixer Truck
Concrete Mixer
Concrete Batching Plants
Hot Sale
Yhzs60 mobile batching plant
Yhzs75 mobile batching plant
hzs75 concrete batching plant
hzs180 concrete batching plant
HM6-D Concrete Mixer Truck
Other link
Facebook
Youtube
Linkedin

Copyright © 2013 - All Rights Reserved - HaomeiMachinery.com