Concrete mixer truck operating rules
Concrete mixer truck operating rules
1.before we use this machine, we need to check every part of this machine to make sure they are in best situation.
2.We also need to confirm each part of the mechanical system seriously to make sure it is in neutral position.
3.After start-up, we need to put stirring stick be in "discharge" position, and discharge water accumulation in the cylinder.
4.When we unload the materials, the stirring stick need to be in loading position.
5.Before transportation, unloading groove must be fixed in the "on" position, to prevent the oscillation.
6.When operating lever, should stay in "neutral" position slightly behind the moving to the next position.
7.Seven, do well the civilized construction, excess material within the barrel is allowed to fall at random.After discharge must be on the mixing barrel, chute, roller and other parts for cleaning.
8.who enters cylinder clearance concrete caking, should be the vehicle flame out, remove the switch key and peripheral people care.
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China