Trailer Concrete Batching Plant
- Condition: New
- Delivery port: Qingdao or Tianjin port, China
- Payment term: L/C, T/T
- Guarantee period: 12 months
- Delivery time: 10-15 days after received deposit
- Installation time: 20days
Trailer Concrete Batching Plant
HZS75 Concrete Batching Plant Features and benefits
1. Stability and Durability: adapt and apply the most advanced technologies around the world
2. Reliability: 16 years of experiences in manufacturing concrete mixing plants
3. Stationary modular structure, fast and easy installation
4. Sicoma mixer, excellent mixing performance with high efficiency and high productivity
5. Double computers with double controls, easy operation
6. Excellent environmental protection, dust collection system and anti-noise design
Technical parameters of this whole concrete automatic production line
Specification | Value |
---|---|
Productivity(m3/h) | 75 |
Capacity of Mixer(m3) | 1.5 |
Mixer Power(kw) | 44 |
Discharge Height(m) | 3.8(for customers choice) |
Aggregate Bin(Quantity) | 3 |
Aggregate Bin Capacity(m3) | 2.4 |
Max.Weighing Value of Aggregate(kg) | 1300 |
Max.Weighing Value of Cement(kg) | 1100 |
Max.Weighing Value of Water(kg) | 500 |
Max.Weighing Value of Additive(kg) | 40 |
Aggregate Measuring Accuracy(%) | 2 |
Water Measuring Accuracy(%) | 1 |
Cement Measuring Accuracy(%) | 1 |
Additive Measuring Accuracy(%) | 1 |
Cement Silo(-) | Optional |
Cement Screw Conveyor(-) | Optional |
Cement Silo Capacity(-) | Optional |
Control Mode(-) |
Auto/Semi Control |
1. The interior of the trailer concrete batching plant needn't to be cleaned manually, not sticking the mixer shaft and the mixing drum cover.
2. The concrete hopper adopts wear-resistant technique, the service life is 5 times of before, and the hopper will not be damaged.
3. Additive scale adopts leakage-proof technique, ensuring the concrete production safety.
4. The water scale adopts pressurized water-discharging technique. It is convenient to add or reduce water, ensuring the control of the concrete slump.
5. Modular design, high industrial degree, fast assembling and debugging.
6. The hopper adopts techniques of not sticking sand and fast unloading. The loading process is fully sealed, which is environmental friendly and pollution-free.
7. The filler bin is installed with centralized controller and negative pressure pulse dust collection device, which facilitates the driver's direct control, realizing the safety of the cement bin and environment protection and dedusting.
8. The operation of the control system is easy, stable, and reliable, having many functions such as supplement, deduction, successive production, intelligent alarm, etc.
we will suggest you the best suitable solution according to your requirement >>
Products Category
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China