asphalt mixing plant features
- Condition: New
- Delivery port: Qingdao or Tianjin port, China
- Payment term: L/C, T/T
- Guarantee period: 12 months
- Delivery time: 10-15 days after received deposit
- Installation time: 20days
asphalt mixing plant features
1,finished product bin beside the stove bottom structure relative structure, greatly reducing the equipment cover an area of an area, at the same time to cancel the finished product the car
Institutions and reduce the equipment failure rate;
2, put bag dust removal in drying drum, reduce heat loss and save fuel and space;
3,imported vibration motor driven linear vibrating screen, improve the screening efficiency, reduces the equipment failure rate;
4,aggregate hoist with double row plate chain, increase the service life of the hoisting machine, improve the stability of operation;
5,the unique mixing blade design and special power-driven mixing cylinder makes more easy, efficient and reliable;
6,to optimize the drying drum lifting plate structure, make dry system more efficient and stable;
7,the reserved heat regeneration device interface, can increase the thermal regeneration of form a complete set of equipment;
8,double machine double charged with automatic computer/manual control system, with the feedback process of fault self-diagnosis, make the operation simple, safe;
9,modular design, make handling, installation more convenient.
we will suggest you the best suitable solution according to your requirement >>
Products Category
Inquiry
(Please write down the product model or any requirement) | |
E-mail: | |
Message: | |
Contact Information
E-mail:chris@concretebatchplant24.com
Tel: +86-371-65621392
Fax:+86-371-86616825
Add : No.14 Waihuan Road,New strict,Zhengzhou,China